S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
185. Before drilling the well casing or the casing shoe, the authorization holder must wait until the cement reaches a resistance sufficient to not compromise the integrity of the well.
O.C. 1252-2018, s. 185.
In force: 2018-09-20
185. Before drilling the well casing or the casing shoe, the authorization holder must wait until the cement reaches a resistance sufficient to not compromise the integrity of the well.
O.C. 1252-2018, s. 185.